Skip to main content

Kom Hajnah to Basandilah Train Times Today & Fares

Return: Basandilah to Kom Hajnah trains

13 trains run daily from Kom Hajnah to Basandilah. The first leaves at 5:23 AM and the last at 11:30 PM; the fastest is train 507 at 45 min. Trains leave from Kom Hajnah Train Station; all stop at Belkas before Basandilah Train Station. Source: Egyptian National Railways timetable, updated 23 October 2026.

Last updated Data sourcesReport a mistake

First train Train 481Ordinaryfrom Kom Hajnah to Basandilah 48m7 stops

Kom Hajnah to Basandilah train timetable

13 trains a day
Kom Hajnah to Basandilah train timetable
TrainTypeDepartureArrivalDurationStopsDistanceFares (EGP)NoteStops list
Train 481Ordinary48m7 stops—Station counterLocal — stops at every station
Train 482-485Ordinary53m7 stops—Station counterLocal — stops at every station
Train 487Ordinary47m7 stops—Station counterLocal — stops at every station
Train 489Ordinary57m7 stops—Station counterLocal — stops at every station
Train 811-812Ordinary1h 3m7 stops—Station counterLocal — stops at every station
Train 509Ordinary54m7 stops—Station counterLocal — stops at every station
Train 491Ordinary59m7 stops—Station counterLocal — stops at every station
Train 493Ordinary48m7 stops—Station counterLocal — stops at every station
Train 507Ordinary45m7 stops—Station counterLocal — stops at every station
Train 495Ordinary48m7 stops—Station counterLocal — stops at every station
Train 497Ordinary52m7 stops—Station counterLocal — stops at every station
Train 499Ordinarynext day23h 59m6 stops—Station counterLocal — stops at every station · No service on Fridays or public holidays
Train 501Ordinarynext day45m7 stops—Station counterLocal — stops at every station

Boarding and arrival stations

Related train trips

Kom Hajnah to Basandilah train FAQ

How long is the train from Kom Hajnah to Basandilah?

The fastest, train 507, takes 45 min; the slowest, train 499, takes 23 hrs 59 min; half the trains arrive in 52 min or less, over 29 km; all trains stop at Belkas, Biyala and Ibshan.

When are the first and last trains from Kom Hajnah to Basandilah?

The first is train 481 at 5:23 AM and the last is train 501 at 11:30 PM: 6 in the morning, 4 in the afternoon and 3 in the evening.

How many trains a day from Kom Hajnah to Basandilah?

13 trains a day, and 11 trains back from Basandilah to Kom Hajnah.

Which station does the Kom Hajnah to Basandilah train leave from?

All trains leave from Kom Hajnah Train Station; some also stop at Ibshan (13 of 13, 3 km). Direct trains to Basandilah also run from Ibshan (16) and Kom Taweel (16). They arrive at Basandilah Train Station; 13 stop first at Belkas.

How do I book a Kom Hajnah to Basandilah train ticket?

All Kom Hajnah–Basandilah trains are ordinary: tickets are sold only at the station ticket office until departure, not online.